NEWS

QOB Completes Reception at 25 Copthall Avenue

Our team, led by Project Manager David Phillips, recently completed the strip out and full Cat B fit out of the live reception area at 25 Copthall Avenue for Helix Property. High-end finishes and features throughout with the installation of structural glazing facade, structural infills, bespoke joinery, specialist Italian flooring, feature lighting and full MEP replacement.

This was a very challenging project due to the environmental constraints of working within a live building with daily access required through the demise of the construction works for the duration of the project.

Throughout the project, landlord and tenant liaison was of paramount importance with regular coordination needed. We used this as an opportunity to build excellent relationships with the landlord and building users.

We received fantastic reviews from both the client and the architects. Rick Slater from Helix Property said: “QOB Interiors were appointed to refurbish the reception area of 25 Copthall Avenue in January 2017. The project has recently completed and we are absolutely delighted with the finished product and the quality of workmanship.

“QOB were really good at working around the tenants and their communication with the on-site building management team was excellent in terms of forward planning and obtaining permits to work. I would have no hesitation in recommending David and his team.”

Following the successful completion of the reception area, we have now been appointed to carry out the strip out and Cat A fit out of level 6 within the 25 Copthall Avenue building.

Project Team:

Principal Contractor: QOB Interiors
Client: Helix Property
Architect: JRA
Project Manager: Core Five
Cost Consultant: Core Five
Services Consultant: Malcolm Hollis

QOB Group © 2015. All Rights Reserved. Privacy policy | Terms & Conditions | Sitemap